- Joined
- Nov 2, 2021
- Messages
- 828
- Reaction score
- 1,187
- Location
- Charleston
- Current Ride
- '21 402A
- Current Ride #2
- 2022 Bronco (wife's)
Who all has a build week of January 10th? Thought this would be a good place to keep track of these trucks and could later be used to track any specific issues that this build week has (hopefully none).
I ordered from Granger on 11/5 and received the email with a Jan 10th build week. Chip at Granger told me last week that it is a Jan 14th build date.
Iconic Silver 402A with everything except bluecruise and the pesky cupholder lights.
Does anyone else with this build week have a Granger order and plan on driving it back south?
I ordered from Granger on 11/5 and received the email with a Jan 10th build week. Chip at Granger told me last week that it is a Jan 14th build date.
Iconic Silver 402A with everything except bluecruise and the pesky cupholder lights.
Does anyone else with this build week have a Granger order and plan on driving it back south?