- Joined
- Aug 24, 2021
- Messages
- 561
- Reaction score
- 613
- Location
- OH
- Military
- USMC
- Current Ride
- Leadfoot 402A - 08/21
I’ve been wondering what this number is in the upper left of the window sticker and I think I figured it out. Along the top you can also find your build date. With that in mind, DRB is for the “Dearborn” plant. I believe the number is specific to the plant and that model of truck. I have been watching the window stickers of the new trucks and the DRB numbers are rising, but not at a total production rate — more in line with a specific trim.
Yes, I think I got the first Tremor out of Dearborn — my sticker below followed by some recent examples. Oh, if I am correct, I believe total 2021 Tremor production will be around 10,000 trucks at the most before they shutdown for 2022.
The first sticker is mine DRB-000001, the two following are just arriving at dealerships. Pay attention to the build dates and the DRB numbers.
First production 2021Tremor was a Lead Foot.
Yes, I think I got the first Tremor out of Dearborn — my sticker below followed by some recent examples. Oh, if I am correct, I believe total 2021 Tremor production will be around 10,000 trucks at the most before they shutdown for 2022.
The first sticker is mine DRB-000001, the two following are just arriving at dealerships. Pay attention to the build dates and the DRB numbers.
First production 2021Tremor was a Lead Foot.
Last edited: